L8 legionella: Legionella Control Duty Rules

The Legionella Control Duty Rules carries 1 published figure read from 2 sources' own pages, from 7 to 7 year, read 15 September 2026.

Median of the published figures
7 year
Range
7 to 7 year
Sources with a figure
1
Sources read that publish one
2 of 21
  1. HSE legionella: landlords' responsibilities7 year

2 of the 21 named sources read in full publish a figure; 19 publish none, read 15 September 2026.

By control-parameter

BreakdownMedianRangeSources
control-parameter landlord-duty7 year7 to 7 year1
control-parameter shutdown-trigger5 day5 to 5 day1

Every figure, with its source

One row per source: the figure the source's own page publishes, the page, and the day it was read. A figure that is not on a page we read is not on this one.

SourceFigureBreakdownRead
HSE legionella: landlords' responsibilities 7 year landlord-duty 2026-09-12
HSE HSG274 Part 1, evaporative cooling systems 5 day shutdown-trigger 2026-09-12
The sentence each figure was read from (2)

Read in full, publishes no figure

19 named sources were read in full on the dates shown and print no usable figure. They are counted, never filled in.

Methodology

Every row is a verbatim sentence read from the named source's own page through the estate's fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2).

2 of the 21 named sources that could be read published a usable figure; 19 published none and are recorded as not published, never filled in; 4 could not be read (blocked, dead or unreachable) and count nowhere.

The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source in year (a source's median where its page yielded several accepted sentences), so N counts sources, never sentences; 4 candidate sentence(s) were refused by a reviewer with the reason recorded.

Derivation as chartered: one row per jurisdiction per control parameter - cold water below 20 C, hot water stored and distributed, sentinel outlet monitoring interval, tank and calorifier inspection interval, review trigger, record retention, notification duty - each quoted verbatim from that jurisdiction's own authority with its effective date; the cross-jurisdiction comparison (which regimes set a fixed review interval and which, like GB, deliberately do not) is the figure, and the risk-assessment template is GENERATED from the ACOP's own required contents rather than written as an opinion; changed-since on every read.

4 candidate sentences on these pages were refused by a reviewer; each refusal and its reason is recorded in the review ledger.

Sources (25)
Cite or embed this figure

Cite or embed this figure

The Legionella Control Duty Rules carries 1 published figure read from 2 sources' own pages, from 7 to 7 year, read 15 September 2026.

2 of the 21 named sources read in full publish a figure; 19 publish none, read 15 September 2026.

Legionella Control Duty Rules, control-parameter landlord-duty: median 7 year across 1 source, read 15 September 2026.

Legionella Control Duty Rules, control-parameter shutdown-trigger: median 5 day across 1 source, read 15 September 2026.

Cite as: "Asbestos Survey Cost Legionella Control Duty Rules", updated 2026-09-15, https://asbestossurveycost.co.uk/datasets/legionella-control-duty-rules/.

Embed this figure (plain HTML, no scripts)

7 to 7 year

1 published figures, Legionella Control Duty Rules, across 2 sources, read 15 September 2026

Source: Asbestos Survey Cost Legionella Control Duty Rules

Download the CSV (2 rows, computed 2026-09-15)

Get asbestos quotesSearch the register