Do i need a bat survey for planning permission (2 sources)

The Bat Survey Season And Validity carries 2 published figures read from 2 sources' own pages, from 18 to 24 month, read 15 September 2026.

Median of the published figures
21 month
Range
18 to 24 month
Sources with a figure
2
Sources read that publish one
2 of 17
  1. Natural England - licence to survey bats for scientific or educational purposes, level 2 (CL18)24 month
  2. NatureScot - standing advice for planning consultations, bats18 month

2 of the 17 named sources read in full publish a figure; 15 publish none, read 15 September 2026.

By jurisdiction

BreakdownMedianRangeSources
jurisdiction Scotland18 month18 to 18 month1
jurisdiction England24 month24 to 24 month1

Every figure, with its source

One row per source: the figure the source's own page publishes, the page, and the day it was read. A figure that is not on a page we read is not on this one.

The sentence each figure was read from (2)

Read in full, publishes no figure

15 named sources were read in full on the dates shown and print no usable figure. They are counted, never filled in.

Methodology

Every row is a verbatim sentence read from the named source's own page through the estate's fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2).

2 of the 17 named sources that could be read published a usable figure; 15 published none and are recorded as not published, never filled in; 1 could not be read (blocked, dead or unreachable) and count nowhere.

The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source in month (a source's median where its page yielded several accepted sentences), so N counts sources, never sentences; 11 candidate sentence(s) were refused by a reviewer with the reason recorded.

Derivation as chartered: one row per jurisdiction per rule: what triggers a survey requirement, which survey type is possible in which months, what licence the work needs and from whom, and how long a report is accepted for - each quoted from that jurisdiction's own nature body, with the four nations side by side, which no authority does because each publishes only its own.

The derived figure the buyer actually wants: the LAST DATE this year on which each survey type can still be commissioned, computed per jurisdiction from the season window, and the count of weeks a project is delayed if that date is missed.

Changed-since on every guidance update.

11 candidate sentences on these pages were refused by a reviewer; each refusal and its reason is recorded in the review ledger.

Sources (18)
Cite or embed this figure

Cite or embed this figure

The Bat Survey Season And Validity carries 2 published figures read from 2 sources' own pages, from 18 to 24 month, read 15 September 2026.

2 of the 17 named sources read in full publish a figure; 15 publish none, read 15 September 2026.

Bat Survey Season And Validity, jurisdiction Scotland: median 18 month across 1 source, read 15 September 2026.

Bat Survey Season And Validity, jurisdiction England: median 24 month across 1 source, read 15 September 2026.

Cite as: "Asbestos Survey Cost Bat Survey Season And Validity", updated 2026-09-15, https://asbestossurveycost.co.uk/datasets/bat-survey-season-and-validity/.

Embed this figure (plain HTML, no scripts)

18 to 24 month

2 published figures, Bat Survey Season And Validity, across 2 sources, read 15 September 2026

Source: Asbestos Survey Cost Bat Survey Season And Validity

Download the CSV (2 rows, computed 2026-09-15)

Get asbestos quotesSearch the register