Ecological survey cost: what a preliminary appraisal and each protected species visit add to the figure, and which parts of a quote are fixed

Ecology is quoted in stages because the work is decided in stages. The preliminary appraisal is a fixed price. Everything after it depends on what the appraisal finds, which is why an ecologist who gives one number for the whole job before visiting is either guessing high or has not understood the site.

Get asbestos quotes

The fixed part

The preliminary ecological appraisal or preliminary roost assessment: a visit, a desk study and a report. Site size, travel and how much habitat there is to map are what move it, and a consultancy given the site boundary and a description will quote it without a visit.

The variable part

Species surveys, each with its own number of visits and its own season. Dusk and dawn visits carry a premium because of the hours. A site needing bats, newts and reptiles is three programmes rather than one.

What is often extra

Environmental records centre data, licence applications, mitigation design, biodiversity metric calculations, and attendance at site during works. Ask which of them are in the quote, because each is a real piece of work and a proposal that omits all four is not cheaper, it is narrower.

Where money is genuinely saved

By commissioning the appraisal early, by fixing the design before the surveys, and by giving the ecologist good access on the first visit. Re visits and re surveys are the expensive part of almost every over budget ecology job.

Questions people ask about ecological survey cost

How much is an ecological survey?

The appraisal is quotable; the species surveys depend on it. Ask for the appraisal price and an indicative range for each species survey the ecologist thinks likely.

Why do quotes differ so much?

Number of visits assumed, number of surveyors, whether reports and licences are included, and travel. Give every consultancy the same site description and the spread narrows.

Is a cheap ecology report a false economy?

It can be. A report the planning authority rejects costs a season, which is worth far more than the difference between two fees.

What is an ecology survey, and which one does a planning officer mean?

It is an assessment of the habitats and protected species on a site and what a development would do to them, and the phrase covers a ladder of different reports. The first rung is a preliminary ecological appraisal, a walk of the site with a desk study, which either clears it or identifies what needs a specialist survey. Above that sit the species surveys, each with its own season: bats, great crested newts, badgers, breeding birds, reptiles, dormice. A planning officer asking for an ecology survey almost always means the appraisal first, and the season is the thing that costs time, because a survey that can only be done between May and September cannot be bought in November.

Sources

Get an asbestos quote from contractors on HSE's own licence register

Free for duty holders and property owners. Your details go to contractors covering your area, not to a call list. We may email you about this enquiry and similar services from this site; opt out any time, including from the first message.

Related answers

Get asbestos quotesSearch the register